Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Allain-Duhangan hydropower project: Foundation stone laid

Tuesday, 22 Nov 2005
Share this on :

Himachal Pradesh Chief Minister, Mr Virbhadra Singh, laid the foundation stone of the 192 MW Allain Duhangan hydropower project on 21 November 2005.

Malana Power Corporation, a private sector entity managed by the LNJ Bhilwara Group, is promoting this project. (See related news for more details.)

The minister said that Himachal Pradesh would be awarding hydropower projects worth around 7,000 MW over the next four months. Out of the total state's potential of 21,000 MW, projects aggregating 6,600 MW are already operational while those worth 7,600 MW are under execution.

Hydropower projects in the state have been categorised under three segments — below 5 MW, between 5 MW and 100 MW, and above 100 MW. While projects above 100 MW would be allotted through the international bidding process, the others (small and medium) would be awarded through the Memorandum of Understanding route.

Also See:

IFC to finance Malana Power project (26-Apr-05)

New Password
Confirm Password