Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

BMC allocates Rs 4,930-cr for Siddhivinayak temple beautification, appoints consultant

Monday, 23 Dec 2024
Share this on :

The BMC has appointed an architectural consultant to create a detailed project report (DPR) for upgrading the precincts of Shree Siddhivinayak Temple in Prabhadevi locality of Mumbai. The beautification project will improve the temple's infrastructure and enhance facilities for devotees. The consultant's tasks will include applying for necessary permissions, following up to secure approvals and drafting tender documents. An allocation of Rs 493 crore has been set aside for this project.

In February 2024, the civic body invited expressions of interest (EoI) for the project. The contract has been now awarded to Engineer Studio. As part of their responsibilities, the consultant will conduct a thorough survey of the site, obtain updated ownership documents, and measure existing structures to prepare a construction plan in alignment with the requirements of the Shree Siddhivinayak Temple Trust.

Furthermore, they will coordinate with municipal departments to gather feedback, obtain a no-objection certificate from relevant authorities, and prepare conceptual designs for final approval. The consultant will also oversee the project’s regulatory processes, ensuring all necessary approvals are secured from municipal, state, and central authorities.

Additional tasks include preparing detailed cost estimates, drafting tender documents, monitoring the project’s daily progress, and others. The project is expected to be completed in 24 months after receiving the required permissions.

New Password
Confirm Password