Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Bangalore Development Corpn. floats tenders for housing project

Monday, 16 Jan 2023
Share this on :

Bangalore Development Corporation has floated tenders for housing project at Sy. No-19, 20 of Konadasapura village in Bidarahalli Hobli in East Taluka of Bangalore on turnkey basis.

The scope of work includes construction of 3.5 BHK-84 Nos, 4.5BHK 112 Nos (224 2 BHK convertible to 4.5BHK 112Nos), 5.5BHK 112(2BHK 112 Nos and 3BHK 112 Nos convertible 5.5BHK 112Nos), with recreation center of built up area 2,432.06 sq mtr with all amenities and terrace (head room area of 44.0 sq mtr) , minimum of 800 nos of covered car parking to be provided in basement and stilt and surface car parking 190 nos. The minimum height of each floor shall be as per NBC and demarking of car parking with numbering of car parking with paint. Two lifts are to be provided for each block.

The work also includes providing, installing, commissioning and testing of electrical works, carpentry works, plumbing works and water proofing work.

The estimated cost of the project is Rs 343.85 crore with a completion period of 30 months.

New Password
Confirm Password