Bangalore Water Supply and Sewerage Board (BWSSB) has invited bids for the design, construction, and commissioning of a 50 MLD sewage treatment plant (STP) at Kadabeesanahalli.
The contract includes the addition of secondary sludge treatment to the existing 50 MLD STP, based on the sequencing batch reactor (SBR) with biological nutrient removal (BNR), along with tertiary treatment, power generation units, and odour control systems. The contract also covers the operation and maintenance (O&M) of the plant for a period of seven years. The turnkey contract will be executed over a period of 36 months.
The last date for bid submisison is 23 February, 2026.