Bids were invited by Mumbai Metropolitan Region Devp Authority for part design and construction of an elevated viaduct and elevated stations of Mumbai Metro Rail Project.
The scope of work involves design and construction of an elevated viaduct and 11 elevated stations, viz. ESIC Nagar, Prem Nagar, Indira Nagar, Nanavati Hospital, Khira Nagar, Saraswat Nagar, National College, Bandra, MMRDA office, Income Tax Office & ILFS (excluding architectural finishing and pre-engineered steel roof structure of stations).
The work will take place from Ch. 34,035.873 to 46,749.923 mtr of line 2B corridor i.e. from D N Nagar to Mandale.
The work is expected to be completed in 30 months at an investment of Rs 998.05 crore.