The Central Public Works Department (CPWD) has invited bids for construction of super specialty hospital at Haridwar.
The scope of work includes design and construction of 300 beds including 50 beds super specialty hospital (two basement + ground + six floors), multilevel car parking (ground + 10 storied), Type-II 28 nos (stilt + seven floor), Type-III 18 nos (stilt + nine floor), Type-IV 12 nos (stilt + six floor) quarters including all internal and external, civil, electrical and mechanical services and horticulture work at ESIC, Haridwar in Uttarakhand in EPC mode (design and build basis).
The estimated cost of the project is Rs 257.69 crore with completion period of 26 months.