Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Cabinet go ahead for railway connectivity between Allahabad-Mughalsarai

Thursday, 18 Jul 2019
Share this on :

The Cabinet Committee on Economic Affairs (CCEA) chaired by Prime Minister Narendra Modi has given go-ahead to construct a third railway line between Allahabad (Prayagraj)-Mughalsarai (now Pt Deendayal Upadhyaya Junction).

The length of 150 km railway line will be developed at an estimated cost of Rs 26,49.44 crore. The North Central Railway will execute the project.

The project will help cope up with future traffic and remove capacity constraints. The third line will also ease traffic congestion at Chheoki, Naini and improve punctuality of goods and passenger trains on vital route connecting National capital.

The project will be completed by 2023-24 and during the construction period will generate direct employment for around 36 lakh man days.

New Password
Confirm Password