Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Common effluent treatment plant to come up in Ahmedabad

Monday, 19 Aug 2019
Share this on :
Ahmedabad Hand Screen Printing Association is implementing a 30 MLD common effluent treatment plant (CETP) at Behrampura in Ahmedabad district of Gujarat.

The project worth Rs 112 crore will be implemented on EPC basis. The project will come up over 25,000 sq mtr of land.

In March 2016, the project was granted terms of reference (ToR) and a month later in May 2016, AMC invited bids for construction of CETP with pumping station on engineering, procuring, constructing and commissioning base and 10 year operation & maintenance for effluent disposal scheme of small scale industrial units of Ahmadabad hand screen printing association of Danilimda-Baherampua area.

The contract for the same was awarded to Larsen & Toubro in July 2016. However, the project was delayed due to awaiting for environmental clearances.

Finally in March 2018, the project received green clearance from the Ministry of Environment, Forest and Climate Change (MoEF&CC).

As per latest information available with Projects Today, work on the project was underway and is expected to be completed by March 2020.

New Password
Confirm Password