Support: +91-22-61011756 / help@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Grey Line extension, Pink Line Metro segment to be opened on 6 August 2021

Monday, 02 Aug 2021
Share this on :
The Najafgarh-Dhansa Bus Stand extension of the Delhi Metro's Grey Line and a small segment of the Pink Line corridor at Trilokpuri are set to be inaugurated on 6 August 2021.

The nearly one km long (891 mtr) Najafgarh-Dhansa Bus Stand section will take the Metro further into the interior areas of Najafgarh.

The opening of the Trilokpuri section, about 289 mtr, between the Mayur Vihar Pocket 1 and Trilokpuri Sanjay Lake stations, will fully link the entire 59 km long Pink Line and connect important landmarks of the city, such as the Anand Vihar Railway station, Anand Vihar ISBT, Nizamuddin Railway station, markets in South Extension, INA and Lajpat Nagar.

The Majlis Park-Shiv Vihar corridor or the Pink Line spans 38 stations. With the opening of these sections, the Delhi Metro network span will become 390 km with 286 stations.

The Najafgarh-Dhansa Bus Stand corridor had recently received the mandatory approval from the Commissioner of Metro Rail Safety (CMRS). This extension of over 4.2 km Grey Line (Dwarka-Najafgarh corridor) will immensely benefit residents of the interior areas around Najafgarh.

The Dwarka-Najafgarh corridor was opened in October 2019, which had connected the urban village area of Najafgarh to the rapid transit network for the first time.

Also, DMRC has built its first-ever underground integrated parking facility at this station on the Grey Line that will allow commuters to park their vehicles and move to the concourse area directly.

The station has been designed as a four-level underground structure where the platforms will be at the bottom (at an approximate depth of 18 mtr), followed by the concourse and then an entire floor for parking above it with the roof level at the top (or the ground level).

Pink Line was opened in multiple phases in 2018. And all stations on the line have been opened. The bottleneck near Triloklouri station had arisen due to multiple issues, including land acquisition, resulting in a portion of Metro segment, then about a few kilometres remaining incomplete, rendering the Trilokpuri Sanjay Lake station a terminus.

After its operationalisation on 6 August 2021, this section will connect the two ends of the Pink Line and provide seamless connectivity to a long range of localities in the National Capital Region.

Important transport hubs such as Nizamuddin Railway Station, Sarai Kale Khan ISBT, Anand Vihar Railway Station, Anand Vihar ISBT, Delhi Cantt. Railway Station, and prominent markets like Dilli Haat-INA, Sarojini Nagar and Lajpat Nagar will get direct connectivity through this corridor.

This corridor will further be extended from Majlis Park to Maujpur in Phase-IV, making it the longest single Metro corridor in India at approximately 70 km. After completion of Phase-IV, the Pink Line will also become the only Ring Corridor of Metro in the country.

 
Post Your Comments
 
 
   
 

 

 
  
Sign up to start your trial access

Are you...



REGISTER AND GET STARTER KIT ABSOLUTELY FREE!

Free access to Project News and Analysis

Project and Tender Alert in your mailbox

Explore the largest Database on Projects for free

Be part of Online Projects Community

User login
Start Exploring

Subscribe to any of our premium plans to

Access to complete information on 43000+ projects

Use our Notification service for instant update on projects and tenders

Closely monitor your opportunities with "WORKSPACE"

Use our online platform for promotions of your products and services