Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Hartek Power secures substation contract worth Rs 138-cr from PGCIL

Thursday, 03 Jul 2025
Share this on :
Hartek Power (HPPL), an engineering, procurement, and construction (EPC) company in the power and renewable infrastructure sector, has secured a substation contract worth Rs 138 crore from Power Grid Corporation of India (PGCIL).

The contract pertains to the development of the 400kV AIS substation package SS-66T, associated with the transmission scheme for integration of Davanagere/Chitradurga and Ballari Renewable Energy Zone (REZ) in Karnataka, through the tariff-based competitive bidding (TBCB) route.

The scope of work involves design, engineering, procurement, construction, testing at the manufacturer’s works, supply (including transportation and insurance), unloading, storage, erection, testing, and commissioning, ensuring turnkey delivery.

This substation will play a crucial role in integrating renewable energy from the Davanagere, Chitradurga, and Ballari REZ into the national grid, aligning with India’s target of achieving 500 GW of non-fossil fuel-based capacity by 2030.
New Password
Confirm Password