Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

India, Nepal to take up rail connectivity projects

Friday, 23 Apr 2010
Share this on :

The Union Government along with the Nepal Government is likely to develop rail infrastructure at five points along the Indo-Nepal border. The MoU in this regards was signed in February 2010.

These five projects estimated to cost Rs 1,373 crore are to be implemented in phased manned. In the Phase I, Jogbani-Biratnagar new line and Jayanagar to Bijalpura gauge conversion and its extension up to Bardibas is likely to be taken up. Detailed engineering survey for Jogbani-Biratnagar has been completed, and the detailed engineering survey for Jayanagar-Bardibas has been taken up.

Details of the five projects are:

Proposed rail links Distance (in km) Latest estimated cost (in Rs cr)
From To
Jogbani Biratnagag (Nepal) 18 243
Jayanagar Bijalpura (Nepal and its extension to Bardibas) 88 447
Nepalganj road Nepalganj (Nepal) 12 149
Nautanwa Bhairahawa (Nepal) 15 176
New Jalpaiguri Kakarbhita via Panittanki (Nepal) 46 358
New Password
Confirm Password