Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

India's longest U-girder installed on Mallige Line of Bengaluru Suburban Rail

Thursday, 19 Dec 2024
Share this on :

K-RIDE has successfully installed a 31-mtrs.-long single-span precast U-girder, the longest of its kind in India, on the Mallige Line of the Bengaluru Suburban Railway Project (BSRP). This milestone, achieved on 17 December, 2024 at Yeshwantpur, is part of the Baiyappanahalli-Chikkabanavara line’s construction.

The U-girder, cast in January 2024 at Gollahalli, is a vital component for the elevated railway system. The installation process utilised two high-capacity cranes to ensure precision and safety. K-RIDE plans to install 450 U-girders on the eight-km elevated stretch of the Mallige Line between Hebbal and Yeshwantpur.

Currently, nearly 60 U-girders have been cast at Gollahalli. K-RIDE, a government agency, oversees the execution of the 149-km Bengaluru Suburban Railway Project, aimed at enhancing urban mobility. 
“U-girders are U-shaped, pre-tensioned, and precast structures commonly used in rail-based public transport projects. Their design enhances quality and expedites construction by reducing the need for multiple foundations and piers due to their extended length,” an official explained.

New Password
Confirm Password