Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

JSW Renew Energy Twenty signs PPA for 300 MW in Pavagada Solar Park

Friday, 23 Aug 2024
Share this on :

JSW Renew Energy Twenty, a wholly-owned stepdown subsidiary of JSW Energy has signed a power purchase agreement (PPA) with Bangalore Electricity Supply Company (BESCOM) for solar capacity of 300 MW awarded by Karnataka Renewable Energy Development (KREDL). The PPA is signed for supply of power until FY 2044 with a tariff of Rs 2.89/KWh.

The aforesaid project is located in Pavagada Solar Park, Karnataka and is expected to be commissioned in next 18 months. The current solar pipeline capacity stands at 3.2 GW with PPAs signed for 1.3 GW. JSW Energy has total locked-in generation capacity of 16.7 GW comprising of 7.5 GW operational, 2.3 GW under-construction across wind, thermal and hydro and RE pipeline of 6.9 GW (PPAs signed for 2.3 GW).

The company also has 4.2 GWh of locked-in energy storage capacity through battery energy storage system and hydro pumped storage project. The company aims to reach 20 GW generation capacity and 40 GWh of energy storage capacity before 2030. 

New Password
Confirm Password