Phase I of L&T Hitech City, the first of the five towers being developed in
the Vijayawada IT/ITES SEZ at Kesarapalli in Andhra Pradesh is expected to be
ready for occupation by end-July 2009.
The proposed IT park is being implemented by the JV of L&T and the Andhra
Pradesh Industrial Infrastructure Corporation (APIIC). The first IT tower is
developed on 1.92 lakh sq ft of built-up area, which is likely to be inaugurated
by the State Chief Minister.
The first tower is a four-storyed structure on stilts having a large floor
plate of 39,000 sq ft. The tower built with low column density and impressive
high ceiling, having double height entrance lobby and spacious lift lobby and
various modern amenities like food court, amphitheatre etc.
Also See:
L&T plans
investment in power, port projects (21-Jul-09)
Related Links:
Project profile