Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Meerut City - Saharanpur section electrification completed

Thursday, 17 Mar 2016
Share this on :

Meerut City-Saharanpur section (113 route km) of Northern Railway has been commissioned on electric traction on 12 March 2016, after inspection and authorisation of Commissioner of Railway Safety, Northern Circle.

Earlier, the Ghaziabad-Meerut City section was commissioned on electric traction on 3 December 2015. In this way, now electrification of the entire Ghaziabad - Meerut- Saharanpur section of 161 route kilometre has been completed.

Electric trains now can run seamlessly from Delhi/Ghaziabad/Khurja towards Haridwar, Ambala, Jammu, Amritsar etc. with reduction in journey time between 30 to 60 minutes.

This entire project, at an estimated cost of Rs 275 crore, has been executed by the Central Organisation for Railway Electrification (CORE).

New Password
Confirm Password