Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Shyam Metalics expands rail infrastructure at steel plant in Odisha

Tuesday, 28 May 2024
Share this on :

Shyam Metalics and Energy (SMEL) has completed the expansion of its rail infrastructure at its integrated steel plant in Pandloi, near Rengali in Sambalpur district of Odisha, in tandem with the company's long-term goal of sustainability. The improved facilities will help manage the increased flow of raw materials and finished products more efficiently.

Previously, the plant operated with two dedicated railway lines. The recent expansion, completed in 2023, has doubled this number to four lines. This includes a lead line from Rengali station, three branch lines, and an engine escape line. The plant's enhanced rail infrastructure now handles over 110 rakes per month. While this is a substantial improvement, the current setup can only manage around 60 percent of the increased demand for raw materials and finished goods.

To address this, SMEL plans to introduce a wagon tippler by 2028. This equipment will further streamline rail operations, doubling the plant’s rail handling capacity and ensuring faster turnaround times for wagons. Moreover, the project now features fully operational overhead electrification.

The expansion of the rail infrastructure is a testament to this commitment, and the addition of a wagon tippler has been planned by 2028.

New Password
Confirm Password