Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Work starts on flyover to connect Dwarka expressway, Rewari highway

Monday, 29 Jul 2024
Share this on :

The National Highways Authority of India (NHAI) has started work on a new 183-mtrs.-long, two-lane flyover connecting the Dwarka expressway with the under-construction Gurugram Rewari highway, near the intersection of Old Pataudi Road and Dwarka expressway.

The project, which started on 26 July, 2024 is expected to be completed by March 2025, as an overhead high-tension power line must be shifted for the construction, which is likely to take three to four months. The flyover will feature two lanes, be 11 mtrs.-wide, and will be unidirectional.

The flyover will allow seamless movement of high-speed traffic coming from Delhi on the Dwarka expressway and merging onto the Rewari Pataudi Highway.

 

New Password
Confirm Password