Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

GMR bags airport project in Turkey

Tuesday, 10 Jul 2007
Share this on :

GMR Infrastructure consortium won the contract for Sabiha Gokeen International Airport (SGA) at Istanbul in Turkey

GMR has a 40 per cent stake while another 40 per cent is held by Limak lnsaat Sanayi San Ve Tic A S Turkey (Limak) and Malaysia Airports Holdings Berhad (MAHB) holds the balance 20 per cent.

The build-operate-transfer project involves construction of a new international airport terminal with a 10mn capacity in 30 months, besides managing the existing domestic and international terminals (with a passenger capacity of 35mn per annum). The current international terminal will be converted to an all domestic terminal, subsequent to construction of the new terminal.

The term of BOT concession will be for 20 years, while the new international terminal is likely to be constructed within a period of 30 months from the transfer of the facility.

New Password
Confirm Password