Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

TPC signs EPC contract with Toshiba Corporation for steam generators

Friday, 10 Aug 2007
Share this on :

Tata Power Company has signed an EPC contract for supply of five 800 MW steam turbine generators with Toshiba Corporation for its first 4,000 MW Mundra Ultra Mega Power Project (UMPP) in Gujarat.

Toshiba Corporation's scope of work includes design, manufacture, test and supply of equipment related to the steam turbine generator packages for the five units of 800 MW each. They will also be associated with supervision of commissioning of the turbines.

This move further reinforces Tata Power's commitment to accelerate the pace of the project by not only ordering the equipments quickly but also tying up with world class technology providers like Toshiba and Doosan Heavy Construction Ltd, ahead of schedule. T

Tata Power recently announced the signing of a contract for complete boiler island scope on EPC basis with Doosan Heavy Industries & Construction, Korea. The contract for complete boiler island includes super critical boilers for the five units of 800 MW each, based on super critical technology required for such large sized units.

Also See:

Tata Power to foray into nuclear power sector (09-Aug-07)

 

New Password
Confirm Password