Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

L&T bags $421 million contract for Kuwait's clean fuel project

Monday, 21 Jan 2008
Share this on :

Larsen & Toubro bagged the contract worth $421 million (Rs.1,695 crore) to manufacture and supply of  22 hydrocracker and atmospheric residue desulphurisation (ARDS) reactors for Kuwait National Petroleum Co's Clean Fuel Project 2020.

The proposed order is the largest export order ever placed with any single manufacturer in the world for such critical reactors.

These reactors will be manufactured from advanced technology steels containing Chromium, Molybdenum and Vanadium, with thickness up to 300 mm and weights up to 1450 tpa. L&T will manufacture these critical reactors in its state-of-the-art facilities at Hazira works.

These reactors are required to be delivered to the refinery in Kuwait by December 2010-11.

New Password
Confirm Password