Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Punj Lloyd arm bags three projects in Libya

Friday, 10 Jul 2009
Share this on :

Sembawang Engineers and Constructors, a wholly owned subsidiary of Punj Lloyd Group, has bagged three orders worth Rs 5,904 crore from International Investment Services Company to build commercial and residential developments in Libya. Sembawang Libya General Contracting and Investment Company, Sembawang's subsidiary in Tripoli, Libya, will be executing these orders.

The first order is to develop Al-Mea'tega Resort Village, a luxurious villa resort located on a 40 ha site on the Mediterranean Coast adjacent to the domestic airport in Tripoli. The project is to be completed by 2012.

The second order to develop Al-Ghiran Village in Tripoli will have a total built-up area of 110,000 sq mtrs. Located on a 13 ha, the mix-development comprises 17 four-storey high-end residential apartment blocks, common recreational facilities and sports hall, 66 luxury villas, a 120-room four star hotel and a 600-seater conference hall building. The project includes landscaping and external infrastructure work and services. The project is to be completed by 2011.

The third order is for the construction of the Al-Froseya Hotel, a five star 150-room hotel comprising solely of suites. The seven-storey hotel will have deluxe facilities including a swimming pool, spa, meeting rooms and a 700-seat conference hall. The total built-up area will be approximately 65,000 sq mtrs. The project is to be completed by 2011.

Also See:

Punj Lloyd arm bags Singapore order (02-Jul-09)

New Password
Confirm Password