Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Inderlok-Mundka metro line to open in March

Tuesday, 23 Feb 2010
Share this on :

DMRC is likely to open the 15.1 km long Inderlok-Mundka line in March 2010.

This line will be opened with 13 trains initially, which will run at a frequency of around five minutes during peak hours. The line is to have 14 stations - Inderlok, Ashok Park (Main), Punjabi Bagh (East), Shivaji Park, Madipur, Paschim Vihar (East), Paschim Vihar (West), Peeragarhi, Udyog Nagar, Surajmal Stadium, Nangloi, Nangloi Railway Station, Rajdhani Park and Mundka. All the stations are elevated.

This will be a standard gauge Metro line in comparison to other lines opened so far which have been on broad gauge. Standard gauge lines have a width of 4 feet, 8.5 inches between the tracks while broad gauge lines have a width of 5 feet, 6 inches between the tracks.

Also See:

Gurgaon to be connected with IGI port through metro (19-Feb-10)

Related Links:
Project profile

New Password
Confirm Password