Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

ACME Solar launches 68 MW of 100 MW wind power project in Gujarat

Tuesday, 20 Jan 2026
Share this on :

ACME Solar has commenced operations of 68 MW out of its total 100 MW wind power project in Surendranagar, Gujarat.

The project is being executed in phases through its subsidiary ACME Eco Clean Energy. The electricity generated from this project will be sold to Gujarat Urja Vikas Nigam under a 25-year power purchase agreement (PPA). Power Finance Corporation (PFC) has financed the project, which adds to ACME Solar’s diverse renewable energy portfolio. The remaining capacity of the project will be added soon.

ACME Solar, based in Gurugram, Haryana, currently has an operational capacity of 2,958 MW and is working towards a construction capacity of 4,562 MW, including 15 GWh of battery energy storage systems.

New Password
Confirm Password