Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

KP Energy gets LoA for turnkey development of 99 MW wind power project in Gujarat

Tuesday, 03 Feb 2026
Share this on :

KP Energy has received a letter of award (LOA) from Inox Renewable Solutions for the development of a 99 MW wind power project on a turnkey basis, located at Bhuj, Gujarat.

The contract involves the installation of Inox-made wind turbine generators (WTG) model INOX DF/3000/145 3.0 MW with a hub height of 122.5 mtrs. KP Energy will handle the complete execution of the project, which includes engineering, procurement, construction, erection, testing, and commissioning of the wind power plant's balance of plant (BoP) works. The company will also be responsible for obtaining the necessary statutory approvals and permits required for the project.

This development is a significant step for the company as it strengthens its footprint in the renewable energy sector, particularly in the wind power segment.

New Password
Confirm Password