Bharat Petroleum Corporation (BPCL) has invited bids for conducting detailed feasibility study for setting up of biomass / agri-residue partially segregated MSW based compressed bio-gas (CCBG) plants at different locations.
The contractual completion period for the study is two months from the date of issue of Letter of Acceptance (LOA) for each location.
The last date for the submission of bids is 24 June 2025.