Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Bondada Engineering gets LoA for 225 MW BESS project from AP TRANSCO

Tuesday, 06 Jan 2026
Share this on :

Bondada Engineering has received a letter of award (LoA) from AP TRANSCO for the development of a large-scale standalone battery energy storage system (BESS) project.

This order is strategically important for the company, as it will generate a stable, long-term annuity-based revenue stream, enhancing revenue stability, cash flow, and return predictability. The total value of the order is approx. Rs. 627 crore. With this new order, Bondada Engineering's cumulative BESS portfolio now totals nearly one GWh, establishing the company as a strong player in India’s growing energy storage sector. 

The contract will involve the development of a 225 MW / 450 MWh Standalone Battery Energy Storage System under the build-own-operate (BOO) model. The contract must be completed within 18 months from receiving the LoA, which aligns with India’s push toward grid-scale energy transition and infrastructure development in energy storage.

New Password
Confirm Password