Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Central railway floats tender for new BG line on Dhule-Nardana section

Wednesday, 03 May 2023
Share this on :

The Central Railway has floated a tender for the construction of a new BG line between Dhule (Borvihir) to Nardana (approx. 49.45 km) under Bhusawal division.

The scope of work includes the construction of earthwork, important bridge, major bridges, minor bridges, road over bridges (ROBs) and road under bridges (RUBs), track laying and miscellaneous civil works from Borvihir to Nardana (49.45 km) in connection with the new line section.

The estimated cost is Rs 750.83 crore, and the contract must be executed in a span of 30 months.

The closing date for bid submission is 5 July, 2023.

New Password
Confirm Password