Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Essar mops up funds for Minnesota project

Thursday, 23 Sep 2010
Share this on :

Essar Steel Minnesota LLC has achieved financial closure for its $1-billion (approx Rs 4,550 crore) project in US. The project comprises open-cast iron ore mining, construction of pit-head beneficiation and a six-million tonne pellet plant at the West end of the Mesabi iron range in north-east Minnesota.

The project is slated to be operational by August 2012. It will supply feedstock to the Essar Group's four million tonne steel plant at Algoma, across Lake Superior in Ontario, Canada.

Essar Steel Minnesota LLC has access to iron ore resources of over 1.4 billion tonne. In the future, Essar plans to add a 2.5 million tonne sponge-iron making facility and slab caster at Minnesota.

Also See:

Essar Steel signs deal with Orissa miners (20-Sep-10)

New Password
Confirm Password