Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Green Energy Corridor Phase-II to boost RE integration, 67 projects awarded

Wednesday, 17 Dec 2025
Share this on :

The government is rolling out the Green Energy Corridor Phase-II (GEC Phase-II) scheme across seven states—Gujarat, Himachal Pradesh, Karnataka, Kerala, Rajasthan, Tamil Nadu, and Uttar Pradesh.

This initiative aims to integrate 20 GW of renewable energy into India's national grid, said Minister of State for New and Renewable Energy, Shripad Yesso Naik. Out of the 91 infrastructure packages planned, 73 have been tendered and 67 awarded. However, despite progress, no renewable energy projects have been connected to the grid yet under GEC Phase-II.

The government has also ruled out any immediate expansion of the existing production linked incentive (PLI) scheme for solar photovoltaic modules, with no plans for introducing a new PLI scheme for domestic solar panel manufacturing.

New Password
Confirm Password