Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

HG Infra-Kalpataru Projects JV declared L1-bidder for viaduct construction for Thane Ring Metro

Monday, 24 Nov 2025
Share this on :

HG Infra Engineering, in a joint venture with Kalpataru Projects International has been declared the lowest (L1) bidder by the Maharashtra Metro Rail Corporation (MMRCL).  

The scope of work encompasses the design and construction of the elevated Metro viaduct for the Thane Integral Ring Metro Project. It includes a 20.527 km-long viaduct between UG Ramp and Balkum Naka, with a depot approach viaduct and three special spans. The construction is scheduled to be completed within 36 months, with a bid cost of Rs 1,415 crore.

HGINFRA holds a 40 percent stake, while Kalpataru Projects controls 60 percent in the JV.

New Password
Confirm Password