Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Hinduja Renewables secures a contract for 250 MW solar project

Tuesday, 07 Nov 2023
Share this on :

On 06 November, 2023, Hinduja Renewables Energy secured a contract to set up a 250 MW solar project under tariff-based competitive bidding by NHPC.

By securing this contract, Hinduja will be able to minimise the carbon emissions equivalent of over 5,51,000 tonne annually and aims to create a multi-GW suite of renewables.

NHPC had issued a tender to develop three GW of interstate transmission system (ISTS) connected solar power projects anywhere in India. Hinduja Renewables, an independent renewable power producer, is one of the eight bidders for the capacity.

Apart from Hinduja, NHPC has awarded a contract to Solairedirect Energy India (ENGIE) with 250 MW, Avaada Energy with 1,000 MW, Hazel Hybren (Mahindra) with 300 MW, Jakson with 400 MW, Sprng Energy with 250 MW, Green Infra Wind Energy (Sembcorp) with 300 MW, and Apraava Energy with 250 MW.

These projects are expected to be commissioned within 18 months from the effective date of signing the power purchase agreement (PPA). The appointed solar project developers will be responsible for obtaining ISTS connectivity.
 

New Password
Confirm Password