Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

KEC International receives LoI for 1,200 MW renewable energy park

Thursday, 22 Sep 2022
Share this on :
KEC International has receives letter of intent (LoI) from Gujarat Industries Power Company. 
 
The scope of work includes design, engineering, manufacturing, assembly, procurement, commissioning for 1,200 MW (Pooling Sub Station-1) of 2,375 MW solar/wind/ hybrid renewable energy park of 2,375 MW capacity at Rann of Kutch area, Gujarat under single EPC basis.
New Password
Confirm Password