Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

KPI Green Energy awarded LoI to develop hybrid power project

Monday, 25 Sep 2023
Share this on :

Bengaluru-based firm Ayana Renewable Power Four has awarded a commercial letter of intent (LoI) to KPI Green Energy for the development of a 145.20 MW wind-solar hybrid power project.

The company's captive power producer (CPP) business segment is strategically placed in Gujarat. The project includes 145.20 MW of wind and 50 MW of solar.

KPI Green Energy would develop the projects in terms of the definitive agreements, which are to be signed between these entities. Under the contract, the company will be responsible for providing various services, including engineering, procurement, construction, and commissioning (EPCC).

In addition, it includes tasks such as land acquisition, design, manufacturing, supply, erection, and testing for the balance of the plant, as well as facilitating power evacuation facilities and securing the mandatory approvals and permits for the project.

Securing this contract demonstrates the company's commitment to the renewable energy sector and also it is a significant step toward its target to achieve 1,000 MW by 2025.

New Password
Confirm Password