Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Land survey underway for Mumbai-Hyderabad Bullet Train Project

Tuesday, 28 Sep 2021
Share this on :
Villagers from Thane district of Maharashtra were informed about the proposed Mumbai–Hyderabad Bullet Train Project, the feasibility of which is currently being surveyed.
 
Once approved, the high-speed rail line will connect Mumbai, Pune and Hyderabad through 11 stations in Maharashtra and Telangana.
 
The National High Speed Rail Corporation (NHSRC) Deputy General Manager N K Patil made a detailed presentation on the project in the presence of Thane Deputy Collector (Land Acquisition) Prashant Suryavanshi and other officials.
 
The entire 649.76 km route will be a green corridor. The work of preparation of the detailed project report (DPR) is presently underway.
 
The bullet train will reduce travel time between Mumbai and Hyderabad from the current 14 hours to just three hours. 
 
A total of 10 stations including Thane, Navi Mumbai, Lonavala, Pune, Baramati, Pandharpur, Solapur, Gulbarga, Vikarabad and Hyderabad are included in the proposed project. The rail line will cover four districts of Thane, Raigad, Pune and Solapur.
 
A total of 1,200 ha of land will be required in the Thane district. The proposed rail corridor is planned to run along major expressways, national highways, greenfield areas and may pass through arterial roads of the intermediate city road network for high-speed rail connectivity between different cities along the corridor. 
 
Drones are being used for the survey of the land required for the project.
New Password
Confirm Password