Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

NTPC Green Energy begins commercial power supply of 6.6 MW in Gujarat

Thursday, 11 Dec 2025
Share this on :

NTPC Green Energy (NGEL) has commenced the commercial power supply of 6.6 MW from its 100 MW hybrid project in Bhuj, Gujarat.

This is part of a wind energy initiative under the 100 MW hybrid project developed in collaboration with Ayana Renewable Power Four, a subsidiary of Ayana Renewable Power, and ONGC NTPC Green, a joint venture between ONGC and NTPC. With the addition of this 6.6 MW capacity, NGEL's total installed capacity now stands at 7,645.675 MW, up from 7,639.075 MW. The project is part of NTPC Group's broader strategy to enhance its renewable energy footprint.

As a result, NTPC Group’s total installed and commercial capacity has now reached 84,931 MW. This marks a significant step towards fulfilling NTPC’s commitment to sustainable energy development.

New Password
Confirm Password