Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

NTPC Green commissions 49 MW in Phase-3 of Khavda solar project

Friday, 22 Aug 2025
Share this on :

NTPC Green Energy (NGEL), the renewable arm of NTPC, has commissioned 49.1 MW in the third phase of its 300 MW Khavda solar energy project in Bhuj, Gujarat.

The company informed that the new capacity became commercially operational from midnight of 22 August, 2025, under the 450 MW hybrid tranche V project. This follows the commissioning of 142.2 MW in the first phase on June 28, and 32.8 MW in the second phase on June 30, consolidating Khavda’s status as a rapidly expanding solar hub.

The commissioning aligns with NTPC Green’s strategy to scale renewable capacity, supported by improved utilisation across operational assets. The growth reflects contributions from new renewable projects, with the Khavda additions set to further strengthen its portfolio.

New Password
Confirm Password