The new integrated terminal at NSC Bose International Airport in Kolkata is
likely to be ready during 2011.
The Airports Authority of India (AAI) is likely to be operationalised the new
integrated terminal by end- December 2011. The new terminal will be ready by
October 2011 and the airport is to become fully operational by end-2011.
An additional space of 600 sq mtrs is to be created for setting up two
additional security check counters. This will help reduce the check-in time of
passengers at the airport. The AAI is planning to introduce In-line X ray at the
integrated terminal complex of the airport for benefit of the passengers.
Related Links:
Project profile