Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

New rules for projects under solar mission

Tuesday, 09 Mar 2010
Share this on :

The Union Government has come out with draft guidelines for selection of new grid connected solar power projects under Phase I of Jawaharlal Nehru National Solar Mission (JNNSM), to enhance confidence of project developers and ensure speedier implementation of projects.

A bundling scheme has been proposed to bundle the solar power with power from the central unallocated NTPC coal based stations and sell it to distribution utilities at CERC determined prices. NTPC Vidyut Vyapar Nigam (NVVN) is likely to undertake the task of selling this bundled power.

NVVN will be nodal agency for sale and purchase of 33 kV and above grid connected solar power projects. For each MW installed capacity of solar power for which a PPA is signed by NVVN, the Union Ministry of Power shall allocate it an equivalent MW, up to a maximum of 1,000 MW capacity.

New Password
Confirm Password