Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

GAIL ropes in Tractebel for consultancy services

Thursday, 25 Mar 2010
Share this on :

Tractebel Engineering has bagged an order worth Rs 41.5 crore from GAIL to provide project management consultancy for the construction of the Jagdishpur (Uttar Pradesh)-Haldia (West Bengal) gas pipeline. In this regard, a MoU was signed on 23 March 2010.

The pipeline is likely to supply natural gas from the Mahanadi and KG basin to end-users in Uttar Pradesh, West Bengal, Jharkhand and Bihar. The 2,050-km long gas pipeline is expected to be completed at an estimated cost of Rs 7,065 crore.

The Phase I is likely to include the construction of 800 km of 36-inch mainlines. Along with the mainline, various spur lines of different combinations of length and diameter will be constructed within 24 months of the commencement of the project.

The Phase II is likely to include the construction of spur lines of two different combinations and is expected to get completed within 36 months.

Related Links:
Project profile

 

New Password
Confirm Password