Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

HCC bags naval dockyard project

Tuesday, 13 Apr 2010
Share this on :

HCC on 12 April 2010 has received a LoA from Director General of Naval Projects for reconstruction and completion of dry dock and associated North and South Wharves at Naval Dockyard in Mumbai. The contract is valued at Rs 608.39 crore.

HCC is required to complete the project within 48 months as per the contract. The company is likely to carry out designing, engineering, including all civil, electrical and mechanical works. The scope of work involves diaphragm walls, cofferdam, underwater concreting, dock walls, pumping systems, ventilation system, sub-station and emergency gen-sets. The permanent dock systems include caisson gates, dock-arm, hauling-in systems and cargo lifts.

Also See:

HCC to acquire controlling stake in Karl Steiner AG (17-Mar-10)

Related Links:
Project profile

New Password
Confirm Password