Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Nexcharge commences mass production of li-ion battery packs and modules at Prantij

Thursday, 05 May 2022
Share this on :
Nexcharge, an exclusive joint venture between Exide Industries (Exide) and Leclanché SA, announced the inauguration of its state-of-the-art, fully automated manufacturing plant at Prantij, Gujarat. 
 
The plant, which is spread across 6,10,098 sq ft (total area) is the largest in India for the production of li-ion battery packs and modules (pouch/ prismatic/ cylindrical). 
 
The facility has six fully automated assembly lines and testing labs with an installed capacity of 1.5 GWh and will cater energy storage systems for India’s electric vehicle market and grid-based applications. 
 
The company has invested more than Rs 250 crore in this state-of-the-art manufacturing facility. The company can now make 3 V to 1000 V battery packs with sizes varying from 10 cm to two mtr.  
 
The company’s production setup is divided into three sections- the module assembly has three production lines for assembling cylindrical, pouch, and prismatic cells.  
 
The pack assembly has two lines for high voltage and low voltage packs and the last one, the FG Testing section has a set of 20 testers for charging and discharging cycle and BMS functioning.
New Password
Confirm Password