Support: +91-22-61011756 / help@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Solarpack secures PPA for 482 MW wind-solar hybrid project

Friday, 14 Jun 2024
Share this on :

Spain-based solar developer and operator Solarpack has secured a 25-year power purchase agreement (PPA) with SJVN for its Ganeko hybrid wind-solar project located in Gujarat. 

The project with a combined installed capacity of 482 MW, with 383 MW in solar and 99 MW wind capacity, is scheduled for commissioning in 2026. It would generate electricity equivalent to the annual consumption of over 2,50,000 Indian households. 

Through the Ganeko hybrid project, the developer has reached a portfolio of one GW in India within the first half of 2024. It fits with its plan to develop five GW of multi-technology products in the country. With the commissioning of the Gorbea and Anboto projects in 2025, and now Ganeko, Solarpack has 1.3 GW of capacity in the country.

New Password
Confirm Password