Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Thal Sena Bhawan construction in progress, completion by 2025

Thursday, 06 Jun 2024
Share this on :

The construction work of the upcoming Thal Sena Bhawan in Delhi is progressing as per schedule. Army Chief Gen Manoj Pande had visited the construction site at Delhi cantonment to oversee the progress of the complex, to be completed by June 2025.

Thal Sena Bhawan, will be the new building of the Army headquarters, and its architectural design draws inspiration from the official emblem of the Army. The eight-storey structure of the Army headquarters' new building will 'complement' the overall Central Vista redevelopment project. 

Some of the best engineering practices which have been adopted in the project include the use of environment-friendly construction material such as fly ash bricks, ashcrete cement, recycled wood, and peri formwork. The Thal Sena Bhawan aims to be a net-zero building and will have its own compost plant, sewage treatment plant, solar panels and electric vehicle (EV) charging facilities to promote clean energy. 

The Army chief also inaugurated a living barrack wih a capacity of 400 beds for troops at the Army HQ Camp at Delhi Cantonment. It has modern amenities, including a central cooling system, and is equipped with modern technologies such as CCTV cameras and biometric attendance systems. Defence Minister Rajnath Singh had laid the foundation stone of the complex in February 2020. It has been under construction since March 2023.

New Password
Confirm Password