Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Torrent Power wins 1,500 MW pumped hydro storage project

Wednesday, 18 Sep 2024
Share this on :

Torrent Power has won a 1,500 MW pumped hydro storage project (PSP), and received a letter of intent (LoI) from Maharashtra State Electricity Distribution Company (MSEDCL). The pumped hydro storage project will supply power to MSEDCL for 40 years.

As part of the pumped hydro energy storage facility agreement (PHESFA), the company will make available to MSEDCL a contracted capacity of 1,500 MW capable of scheduled discharge of eight hours, with maximum continuous five hours, per day.

Torrent Power has a presence across the entire power value chain, from generation, transmission, to distribution, and is also working on green energy pathways like green hydrogen projects. 

The company intends to install about five to eight GW of PSP capacity entailing investment of Rs 25,000-35,000 crore, led by Increased penetration of solar and wind in electricity generation and has identified PSP sites in multiple states.

New Password
Confirm Password