Support: +91-22-61011756 / help@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Trident Group commissions solar power plant at Budhni

Friday, 23 Sep 2022
Share this on :
Trident Group has completed solar power project of 8.87 MWp at Budhni, Madhya Pradesh. As per the company communique of the total capacity completed, it has commissioned the Phase-I of 5.48 MWp Solar Power Plant. 
 
The balance capacity of 3.39 MWp part of the Phase-II of the project is expected to be commissioned within the next 15 days. 
 
The power generated from this solar power project shall be consumed captively by the manufacturing facilities of the group located at Budhni, Madhya Pradesh.
 
Post Your Comments


  
New Password
Confirm Password