Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Vashi creek bridge expansion, E-way bypass to begin in September

Friday, 13 Jul 2018
Share this on :

The work on the extension of the Vashi creek bridge and the Mumbai-Pune Expressway bypass will begin in September 2018.

Larsen & Toubro (L&T) will build a six-lane bridge along the existing Vashi creek bridge to align with the recently widened 12-lane Sion-Panvel highway.

Apart from this, IL&FS and Afcons will build eight-lane tunnels and bridges, respectively, for the Mumbai-Pune Expressway bypass between Khopoli and the Sinhagad Institute to reduce congestion in the Lonavala ghat section.

The government of Maharashtra has extended the toll period on the Vashi creek bridge till 2036 and the Mumbai-Pune Expressway till 2045 to raise funds.

The 13 km bypass will separate traffic on the expressway and the old Pune highway which shares roads in the Lonavla ghat section and gets stuck in snarls, and reduce travel time between Mumbai and Pune by 25 minutes.

New Password
Confirm Password