Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

NEC's bridge in AP inaugurated

Saturday, 27 May 2006
Share this on :

On 27 May 2006, Andhra Pradesh Chief Minister, Dr. Y S Rajasekhara Reddy inaugurated the 3 km. high level bridge linking Puligadda in Krishna district to Penumudi in Guntur district.

The bridge implemented by Navayuga Engineering Co. on a BOT basis, completed the project within a period of 11 months, 19 months ahead of schedule.

Salient features of the bridge are as follows:

  • Overall width of the bridge is 11.05 metres
  • Length of each span is 42 metres
  • Foundations consisting of large diametre bored cast-in-situ RCC piles
  • RCC circular solid piers of 2.0 metre in diametre and about 6 metre in height.
New Password
Confirm Password