Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Amritsar-Kolkata Industrial Corridor to get Cabinet's nod by January 2014

Saturday, 21 Dec 2013
Share this on :

The Amritsar-Delhi-Kolkata Industrial Corridor project is likely to get the Cabinet's approval by the first week of January 2014.

 

The Japanese government will provide financial and structural assistance required to commission the project.

 

The Amritsar-Kolkata Industrial Corridor is modelled on the Delhi-Mumbai Industrial Corridor (DMIC) and will use the Dedicated Eastern Freight Train Corridor as the backbone.

 

The project will cover Punjab, Haryana, Uttar Pradesh, Uttarakhand, Bihar, Jharkhand and West Bengal regions.

 

The Bangalore-Mumbai Economic Corridor (BMEC) project is on track and the United Kingdom has shown interest in taking up the project.

 

Recently, international bids for request for qualification (RfQ)-cum-request for proposal (RfP) have been called to select a consultant to prepare a prospective plan for the above project.

 

Related Link:
Project profile

New Password
Confirm Password