Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

GAIL Jubilee Tower inaugurated in Noida

Saturday, 05 Apr 2014
Share this on :

GAIL India, inaugurated its new office building titled ‘GAIL Jubilee Tower’, located at B-35, 36, Sector-I, Noida, Uttar Pradesh.

 

On 3 April 2014, GAIL India’s new office building was inaugurated by Saurabh Chandra, Secretary, Ministry of Petroleum and Natural Gas (MoPNG).

 

The 22 storey new office building has height of 118 mtr and is equipped with high-speed lifts.

 

The new office building has been designed as per LEED-Platinum Green Building norms. The building has its own captive power generation plant using gas engine generators and the waste heat emitted out of it is used to run the Air Conditioning system. Also a 30 kW solar plant has also been installed for area lighting.

 

Also it has a three tier semi-automatic car park, which can house about 265 vehicles in the basement. The new office building has a sitting capacity of 600 people and houses the National Gas Management Centre (NGMC) which is linked to all the major pipeline centres of GAIL, called Regional Gas Management Centres.

 

The construction of the building was completed in four years. Besides the building has a sewage treatment plant and rainwater harvesting system.

New Password
Confirm Password