Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Kenya govt to construct temporary floating pedestrian bridge

Thursday, 11 Jun 2020
Share this on :
Kenya government through the Kenya National Highways Authority (KeNHA) is set to begin construction of a floating temporary pedestrian bridge in Likoni, Mombasa.

The Likoni Floating Bridge will comprise 529 mtr floating section stretching from north to south of Likoni, with 54 mtr approaches on either side of the floating span.

It will be connected by pins and hinges with guard rails mounted on either side of the deck to guarantee safety of pedestrians.

The project involves construction of pile foundations and a Bailey bridge with movable main steel bridge in the middle of the channel to allow movement of ships.

The project has been awarded to the China Road and Bridge Construction (CRBC) and it is to be completed in six months.

The project will entail an investment of USD 14 million, fully funded by the government of Kenya.

New Password
Confirm Password